The Workdry Group ESG Report 2025 - Report - Page 68
Environmental
Sustainable Property Strategy (continued)
Energy
•
•
•
•
•
•
Full sub-metering of major end-uses to
support monitoring and optimisation.
Passive design analysis to reduce mechanical
heating, cooling and lighting demand.
Installation of BMS system to enable energy
management and efficient scheduling.
PV array installation on roof.
Plan to review further smart building
technologies post occupancy.
Design and installation of electric vehicle
charging infrastructure.
Pollution
•
•
Electrified heating and hot water systems,
avoiding combustion-based plant.
Strong pollution control measures supporting
community and environmental protection.
Waste
•
•
•
•
Land Use & Ecology
•
•
•
•
Materials
•
•
Materials procured for construction with verified
Environmental Product Declarations (EPDs).
Designing for durability and resilience to reduce
long-term maintenance and replacement impacts.
Page | 68
Pre-demolition audit to maximise reuse and
recycling opportunities.
Use of recycled and responsibly sourced
aggregates.
Design for disassembly and adaptability.
Outcome: Very strong waste performance
aligned with circular economy principles.
Redevelopment of a brownfield site.
Targeted biodiversity net gain with habitat
enhancement proposals.
Long-term ecology management and
maintenance planning.
Site-specific transport assessment and travel
plan, for efficient travel practices for building
end users.
Water
•
•
Efficient sanitary fittings specified, designed
and installed throughout the development.
Rainwater harvesting incorporated into the
design.